Skip to main content
Translate
Default
English
Español
Français

UP TO THE MINUTE

By Emma Peterson. After identifying challenges with recruitment, communication and outdated ...
By Cotney Consulting Group. The real risk is signing the ...
Read More
ABC Supply -  Ad - No matter the roof, we
ContractorScore Ad
RCS -  Ad - Global Launch
Sherwin-Williams -  Ad - MetalRoofingElements - Fire
Tremco -  Ad - Permafab Max
IKO -  - Dynasty
Translate
Default
English
Español
Français
Roofing Around the World
Starts in
06 days 21 hours 31 minutes 33 seconds
Learn More

Duke University Health System Roof Replacement Posed Special Challenges - CFE Inc.

AUG - ProjProfile - FiberTite - Duke University Health System Roof Replacement Posed Special Challenges
September 3, 2018 at 5:59 a.m.

By FiberTite.

CFE Inc - Working around preinstalled steel beams with 44 recessed roof areas at various elevations were just part of the challenge.

In early 2006, work began to replace the hospital's old and failing built up roof (BUR). As part of the complete re-roofing project, Duke University Health System officials wanted to incorporate a multi-platform roof-top heliport on its facility to provide enhanced emergency services for its patients as well as a vegetative roof-top patio. Because medical facilities are sensitive environments, officials needed a roofing system that was durable, reliable and resistant to chemicals found in aviation environments.

Download the full case study to read the rest of the story and learn how CFE, Inc. of Apex, North Carolina was able to meet and overcome those challenges and find out what system they used on the 90,000 square foot roof.



Recommended For You


Comments

There are currently no comments here.

Leave a Reply

Commenting is only accessible to RCS users.

Have an account? Login to leave a comment!


Sign In
RCS - Banner Ad - Global Launch
Translate
Default
English
Español
Français

UP TO THE MINUTE

By Emma Peterson. After identifying challenges with recruitment, communication and outdated ...
By Cotney Consulting Group. The real risk is signing the ...
Read More
Equipter - 4000 -
Tremco -  Ad - Permafab Max
MuleHide -  Ad - Fleece Back Oct 2025
ContractorScore Ad
IKO -  - Dynasty
Sherwin-Williams -  Ad - MetalRoofingElements - Fire